1. How do I prepare the ground for my Shed.?
You can prepare the ground in several ways or we can provide all of the methods listed.
-Cement Blocks placed under the buildings support runners and when neccasry wooden shims are placed on top of the block to make sure the building is level. Wooden Shims or Cement Blocks are included within The Cost of Your Shed as long as the Ground is less than 8" out of Level.
-A Gravel Pad Created by removing 4" of Sod and fill with 3/4" Crushed Gravel. Gravel Must Be LEVEL. Please Call for more Information.
-A Concrete Slab can be used. Pour a Slab at least 4" thick, make it 1" Smaller than the floor Size of Your building. Please Call for more Information. Concrete Must Be LEVEL.
-Wooden Posts or Piers can be used in extremly unlevel Areas. Please Call for more information.
-We Can Provide all of the above listed Methods. All Sites Must Be LEVEL.
2. Is a Gravel or Concrete Base Required?
No. Most of our Sheds are installed on Concrete Blocks that we provide for No Extra Cost.
We will install a gravel base for our sheds for the following prices.
8x10 Shed, 10x12 Base $750
8x12 Shed, 10x14 Base $800
10x10 Shed, 12x12 Base $850
10x12 Shed, 12x14 Base $900
10x14 Shed, 12x16 Base $950
10x16 Shed, 12x18 Base $1,000
10x20 Shed, 12x22 Base $1,100
12x16 Shed, 14x18 Base $1,100
Additional charges apply beyond 12" at the deepest point.
Gravel Base includes-
-Weed barrier under gravel,
-#57 Limestone gravel, compacted with tamper
-4x4 pressure treated perimeter to contain gravel.